The Final Environmental Impact Report (FEIR) has been released for the Port of Long Beach's (POLB) proposed redeveloped of a rail yard to transition more cargo to rail.
Currently, POLB says the ability to build long trains is limited due to the lack of adequate yard tracks and the configuration of mainline tracks. The proposed Pier B On-Dock Rail Support Facility would change this by providing track space to join together trains assembled at terminals. No cargo trucks would visit the facility, which POLB says would enhance the environmental benefits of the facility by pushing more cargo to rail transportation. Further environmental benefit would be seen from the rail facility's operator, Pacific Harbor Line, a switching railroad that has converted its fleet to clean diesel locomotives that reduce air pollution and save fuel.